Quantcast
Channel: SCN : All Content - All Communities
Viewing all 3442 articles
Browse latest View live

How to determine the display type of Exceptions to be seen in the resultant BEx Web report while executing BW Web Templates

$
0
0

Purpose:

How to determine the display type of Exceptions to be seen in the resultant BEx Web report while
executing BW Web Templates. For example: to display the Exception in BEx Web report in
Symbol and Text format instead of color format.


Overview:

What steps need to be followed  to determine the display type of Exceptions to be displayed in
the resultant BEx Web report while executing BW Web Templates. For example: to display the Exception
in BEx Web report in Symbol and Text format instead of color format while executing
BW Web Templates.


Steps to be followed in this regard:

When executing a Web Template (which has Query containing exception assigned as Data Provider),
the following page is displayed for example.

 

picture 1.png

In transaction RSCUSTV27 in relevant SAP BW Backend system, the following parameters are set:

image 2.png

 

Here, we can find that parameter Ad Hoc Analysis means Default /Standard Web Template  is blank.
It means Default /Standard Web Template  0ANALYSIS_PATTERN is used while executing the query
when the problem regarding Exception in BEx Web report in color format while executing BW Web Templates.

Suppose if you want to display Exception in BEx Web report in Symbol and Text format instead of color format
while executing BW Web Templates, please keep a note of the following:

 

1)Please go to Web Application Designer of relevant  SAP BW Backend system and open Default/Standard Web
Template 0ANALYSIS_PATTERN and go to Web Item ANALYSIS. In the properties for Web Item ANALYSIS(in the
left side of the page) ->  go to section Cell Content -> Here, you can find Exception Visualization (which is
Exception Visualization [EXCEPTION_RENDERING]) is displayed as Color (Default)

 

image3.png

 

2) Make a copy of Default/Standard Web Template
[Analysis - 0ANALYSIS_PATTERN] and name it as for eg: ZANALYSIS_PATTERN3 and in
this Web Template ZANALYSIS_PATTERN3  -> Go to  Web Item ANALYSIS
-> In the properties for Web Item ANALYSIS (on the left side of the page)->  Go to section Paging ->
Here, you can change Exception Visualization (which is Exception Visualization [EXCEPTION_RENDERING]) from
Color (Default) to Symbol and Text [SYMBOL_TEXT] and save this Web Template ZANALYSIS_PATTERN3

 

image 4.png

Please DO NOT make any changes in Default/Standard Web Template [Analysis - 0ANALYSIS_PATTERN]

 

3)Go to the relevant SAP BW Backend system and open transaction RSCUSTV27 and change the parameter
Ad Hoc Analysis from blank to ZANALYSIS_PATTERN3 and save it and then restart the Java server to
make these settings effective.

image 5.png

 

4)Now, execute the Web Template in question and you should be able to see Exception with Display Type
as Symbol and Text
in the resultant page instead of Color.

 

picture 2.png

Please refer the following link with regard Exception Visualization [EXCEPTION_RENDERING]:

http://help.sap.com/saphelp_nw73/helpdata/en/76/489d39d342de00e10000000a11402f/frameset.htm


Start Time Tolerance deduction

$
0
0

Hi,

 

I have below requirement for calculating the loss from tolerance times:

 

DWS hours:                    

Planned Working Time -      08:30  TO 05:30

Begin Tolerance  --                08:30 to 09:30              

End Tolerance --                    05:30 to 06:30

 

If EE comes within the planned begin tolerance time i.e 08:30 to 09:30 AM, then there is no issue. But if EE clocks in at say 09:45 AM, then the system should clock 0:15 mins for deductions.

 

Also the deductions would only apply to 2 particular subgroups -- 01 and 02.

 

Can the experts please guide me how to do this. Does this need a PCR? If yes, how to do this?

 

Please help.

SAPUI5 integration in Fiori Launchpad

$
0
0

Hello,

I'm not sure if this is the right place to ask, but still...

 

I have an HTML5 application written in WEB IDE abd deployed to HCP.

This app uses destinations which are defined in the cockpit (those destinations are for the app's server side logic. The server side resides at HCP as well).

As standalone app, it works correctly, but when I registered it at the Launchpad and tried to run it from there, I got error when trying to connect to the server side.

 

The online help: https://help.hana.ondemand.com/cloud_portal_flp/frameset.htm?4fb8ac705c834944b3701321f6ce5265.html

says it is enough to have the app deployed to the HCP and all destinations working. those are fulfilled, but it still doesn't work from the Launchpad.

 

How and where should I manage the app's paths to make it work as standalone app and also from the Fiori Launchpad?

 

Regards.

FOX Infoprovider statement

$
0
0

Hi All,

 

As of BW7.4 SP8 there is a way to directly access data in another external aggregation level using the FOX Infoprovider statement.

 

Has anyone used it? Can you share how?

 

Can you directly assign a value from the external inforpovider?

 

Example:

 

*change {keyfigure,fiscalyearperiod}

 

Infprovider agglevelexternal.

 

{keyfigure,fiscalyearperiod} = agglevelexternal.{keyfigure,fiscalyearperiod | version= previousyear} * 1.05.

 

 

Thank you for sharing your experience.

 

Andy

How I can find which order in co88 cause this error? "Field overflow during price calculation"

$
0
0

Hi,

 

I run co88 in background job, but job is canceled by this error "Field overflow during price calculation ".

how i can find which order and which material make this error ?

 

regards.

Mahtab

Casual Leave Is not Getting Deducted from Casual leave Quota

$
0
0

Dear Guru's,

 

I have Facing an Issues, I dont know whether I can call it as Issue.

 

For some Employees Casual Leave is not getting Deducted from Casual leave Quota.

 

I have Checked all the groupings and Config and Cross verified in Dev and PRD everything is fine.. and even created test data in Dev and it is working Perfectly ..

 

need your Suggestions to solve this.

 

Please have a look it below Screen shots and Help me on this.

 

Below is the Screen Shot for IT2001 and Casual leaves are highlighted in Yellow Colour.

 

IT2001.PNG

 

Below is the Screen Shot for IT2006..Employee has applied 5 Casual leaves But in deduction Period it is showing 0.

 

IT2006.PNG

 

Need your Expert solution to overcome this.

Time for Deploying Eclipse OData Project

$
0
0

Dear All,

 

I am sure a number of developers must have noticed this error. On SMP 3.0 Integration gateway, when we deploy a project from Eclipse it takes a huge amount of time depending on the number of entities that we have in the project. Roughly its 1 min/entity. So supposedly if we have 15 entity sets inside our project it takes around the same or more than that amount of time to deploy. Is there a way to optimize this?

 

Jitendra KansalMidhun VPMarvin HoffmannBjoern Woppmann  Ur inputs on this pleaase

HR INFOTYPE OPERATION

$
0
0

Is there any released function module that performs the same work as this fm?? Has anyone ever faced any issue because of using this

 

Regards


Leave Travel Allowance

$
0
0

Hi Experts,

 

I am starting with Leave Travel Allowance-

 

As i understand i need to create a separate leave type,please guide me what should be the properties of that leave type.

 

How that leave type is to be mapped in to LTA & how the exemptions, payments will take place through payroll.

 

 

Please share some of the links to get an idea as i could not find any useful thread.

how to execute '.exe' file from AL11 by web dynpro

$
0
0

Hi Experts,

 

I am new to web dynpro concepts please assist me below requirements.

 

My requirements,

 

1. I have to keep (.EXE) file in application server or wherever it is possible in SAP . Here I ( Users ) have to execute that .exe file from web dynpro application by clicking a button.

 

2. If user click on SAVE button in the tool (Which is executed from AL11/ some where in SAP environment ) after he performed in tool it is has to save as attachement with document number and document type ( PLM concept )?

 

          Here how I can capture that save option in coding (For example: In module programming we are capturing sy-comm by OK_code )

 

     My doubts: 1. Where I need to keep the file in sap to execute.

                        2. what the procedure to execute .exe file by using Web dynpro concept.

                        3. How can I capture the SAVE button code in the tool (Non-sap tool ) ?

 

 

 

Thanks in advance.

 

Regards,

Rajesh

import from microsoft to project--ppm

$
0
0

hello,I got a problem these days.when i import a MSP(*.mpp file) to my cProject ,I got a error message:

 

Enter an identification for the object


Tasks and checklists under project definition are not allowed

 

I have found some configurations from "service.sap.com" and checked it in SAP GUI,but i don not know which place need to be maintained ,I am a newbie of PPM , so please tell me the every step of the integration between Microsoft Project to PPM,thanks!

[Ugent help] BPC Launch Pad missing Office Icons

$
0
0

Dear all

We are using EPM addin SP18 patch2, and Window 7 - 64 bit O.S.

Till last week it worked well But from today, the Admin console home page missing the icons of Microsoft office i.e excel,word etc.

 

we have tried to reset browser/ re-install EPM addin but nothing worked out.

could you please advise

 

 

Microsoft office 2010 - 32 bit version.

EPM addin SP18 patch2 - .Net 3.5 version.

IE - V 11

Windows 7 - 64 Bit O.S

 

Font-Adaption Afaria SSP

$
0
0

Hi

 

On some devices, the font size of the Self-Service Portal is rather small.

 

I've read these ressources explaining how to customize the SSP:

http://scn.sap.com/docs/DOC-55490

http://scn.sap.com/docs/DOC-58943

http://scn.sap.com/docs/DOC-58866

 

 

But this is an Overkill for just changing the font (Microsoft Visual Studio Required...).

 

Is there a simpler method (configuration/setting) to change the font appearance of the SSP to make it more readable on certain devices?

 

Kind regards,

Tobias

Error (-6002)

$
0
0

SBO Version: 8.82 PL10

 

Forum,

 

I have encountered a strange issue with trying to add an AR invoice - upon clicking 'Add' I receive a red line at the foot of my screen as illustrated below:

 

Has anyone ever come across this before? There are no add-ons running.

 

Thanks,

 

Sarah

Cutover planning in SAP PP

$
0
0

Dear all


 

I am planning the cutover activities for the SAP PP area and therefore I would like to know, which open objects should I consider for this transition phase.


I am thinking about planned orders, production orders and process orders still open, especially those that still have several phases to cover at cutover.


 

Apart from the aforementioned situation, which objects should be considered carefully for cutover planning in SAP PP? Any opinion from your experience can be useful for me.

 

Thanks!

M.


Budget issue

$
0
0

Hi,

 

I have issue related to Budget.  We have a scenario where purchase order of project is created in 2014.  Work is continued in current year also.  User is trying to edit services in purchase order.  but system is showing error of budget for year 2014.  What are the possible reasons for budget check of previous year ?

 

Regards,

Akshata

XSUnit - Mocking for View with StarJoin

$
0
0

Hi Community

 

We are starting to use the XSUnit framework. And there we encountered a problem with testing a cube (graphical calculation view) with a star join. The view that is used in the star join cannot be mocked by a table (because tables seem to be not allowed in star joins (?)).

 

Is there a possibility to XSUnit-test a cube with a star join?

 

Thanks,

Dirk

Java applications status in NWA - best practice and export to excel

$
0
0

Hello experts.

 

I would like to export a current "snapshot" of Java application and Java services in NWA.

 

For some reason - no "export to excel" button is there for me to use. I have tried searching around some more but it seems there is nothing to use.

 

Also, is there a best practice regarding what applications and what services should be started?

 

Regards,

Imanuel Rahamim.

BEX WEB Application

$
0
0

HI guys,

 

 

work around is

Bex Web Application(BI Platform 4.1 Support Pack 5)

BW 7.3 (BI content)

                                       

 


We are able to login to Bex Web Application as you can see in the below screen shot.


 

 

but when we click on open tab,it displays error as "The command Call Open Dialog [LOAD] is not supported on this platform"..Which can be seen in the below screen shot.





please help us to solve this issue as it is very urgent....



Rescheduling of Process Orders after Partial Confimation (Oper. Duration)

$
0
0

Hi experts,

have following problem, question.

Have a process order 10000 PC, one operation/phase - processing time (duration) 100H.

 

Now following scenario:

(1) posting first partial confirmation of the phase 1 PC and reschedule order since would like to know the new operation end. Order/operation end does not change so much since 1 PC does not consume the duration so much.

(2) posting second partial confirmation 1 PC again, after 2 hours (so we produce slower than expected, normally should be 200 PC to be confirmed now) and would expect that the order/operation duration would again will not change much after rescheduling since only 2 PC were produced.


But what happens is, the operation duration is reduced by 2 hrs after second confirmation is posted when order is rescheduled. Is this standard sap functionality that operation duration is reduced not by confirmed partial quantities (partial times) but by time interval passed between last partial confirmation and second last confirmation?


The production Resource formula for processing time is nothing special, just using operation qty / base qty * standard value for machine time.

Seems to me this formula works only when order is being created and scheduled. After that some other logic is used...


How can I achieve what I described above, that after operation rescheduling the operation is reduced by time equivalent posted in partial confirmations?

 

Thanks for your help.

 

Kind regards,

Juraj

Viewing all 3442 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>